Fuel flow rate through a rotary cup atomization system must be maintained within the design range taking into account the viscosity and volatility of the fuel. No toxicity factors are specified in the method to compute risks from such emissions. Owners and operators of industrial furnaces e. If remedial action is infeasible, the operator of the range must maintain a record of the event for as long as any threat remains. Support for such demonstration shall be included in the operating record. The facility may burn hazardous waste only under the operating conditions that the owner or operator establishes under paragraph b 3 of this section until the owner or operator submits a revised certification of precompliance under paragraph b 8 of this section or a certification of compliance under paragraph c of this section, or until a permit is issued.
The feed rate screening limits for carcinogenic metals are implemented as prescribed in paragraph b 2 of this section. The owner or operator may request reimbursements for partial closure only if sufficient funds are remaining in the trust fund to cover the maximum costs of closing the facility over its remaining operating life. If you are using the financial test to demonstrate coverage of both liability and closure and post-closure care, fill in the following four paragraphs regarding facilities and associated closure and post-closure cost estimates. To meet the specification, none of the differences shall exceed 3 ppm. The coverage is provided under policy number ------ , issued on date.
The methods included in this document are: 1. If t meas is greater than t crit, it can be concluded with 95% confidence that the two groups are not from the same population. This report must include: i The specific condition s that you failed to meet for the waste; ii A description of the waste including the waste name, hazardous waste codes and quantity that lost the exemption; and iii The date s on which you failed to meet the condition s for the waste. This option is conceptually the same as the basic approach Steps 1 through 9 and does not involve complex calculations. The wording of the endorsement must be identical to the wording specified in §264.
Is line 5 at least 6 times line 1? Signature of authorized representative of Insurer Type name Title , Authorized Representative of name of Insurer Address of Representative. Current plugging and abandonment cost estimate means the most recent of the estimates prepared in accordance with § 144. The testing must be conducted when burning normal hazardous waste for that day at normal feed rates for that day and when the air pollution control system is operated under normal conditions. The result is the adjusted post-closure cost estimate. The policy must also guarantee that once post-closure care begins, the insurer will be responsible for paying out funds, up to an amount equal to the face amount of the policy, upon the direction of the Regional Administrator, to such party or parties as the Regional Administrator specifies. Each subsequent quarterly test must be completed within three months of the preceding quarterly test. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
The resulting ratio, Q meas, is then compared with rejection values that are critical for a particular degree of confidence, where Q meas is: The 90% confidence level for data rejection is used in this method. The owner or operator shall keep a copy of this written notice as part of the operating record. In such a case, the facility would be in violation of the metals standard. Owners and operators of boilers and industrial furnaces that burn hazardous waste and are operating under interim status are subject to the following provisions of part 265 of this chapter, except as provided otherwise by this section: i In subpart A General , §265. A limit for a parameter may be established and continuously monitored and recorded on an instantaneous basis i. The audit must include a review of the calibration check data, an inspection of the recording system, an inspection of the control panel warning lights, and an inspection of the sample transport and interface system e.
That portion of the system that records a permanent record of the measurement values. An owner or operator of a new facility must submit the certificate of insurance to the Regional Administrator at least 60 days before the date on which hazardous waste is first received for treatment, storage, or disposal. One probe, located at the stack or duct centroid, is used as a stationary reference point to indicate the change in effluent concentration over time. In addition: 1 To minimize emissions of organic compounds, the minimum combustion chamber temperature or the indicator of combustion chamber temperature that occurred during the compliance test must be maintained while hazardous waste or hazardous waste residues remain in the combustion chamber, with the minimum temperature during the compliance test defined as either: i If compliance with the combustion chamber temperature limit is based on an hourly rolling average, the minimum temperature during the compliance test is considered to be the average over all runs of the lowest hourly rolling average for each run; or ii If compliance with the combustion chamber temperature limit is based on an instantaneous temperature measurement, the minimum temperature during the compliance test is considered to be the time-weighted average temperature during all runs of the test; and 2 Operating parameters limited by the certification of compliance must continue to be monitored during the cutoff, and the hazardous waste feed shall not be restarted until the levels of those parameters comply with the limits established in the certification of compliance. The goal is to estimate the percentage of the area within a 3-km radius that is urban type and the percentage that is rural type. It is recommended but not required that the feedrates of hazardous metals in all feedstreams also be monitored. Your plan must describe emergency response arrangements with local authorities; describe evacuation plans; list the names, addresses, and telephone numbers of all facility personnel qualified to work with local authorities as emergency coordinators; and list emergency equipment.
Composite samples may be used to develop a sample for analysis provided that the compositing period does not exceed 24 hours. During the compliance test required by paragraph c 3 of this section, and upon certification of compliance under paragraph c of this section, a boiler or industrial furnace must be operated with a functioning system that automatically cuts off the hazardous waste feed when the applicable operating conditions specified in paragraphs c 1 i and v through xiii of this section deviate from those established in the certification of compliance. The difference between the minimum and maximum concentration that can be measured by a specific instrument. Guarantor reserves the right to modify this agreement to take into account amendment or modification of the liability requirements set by and 265. The result is the adjusted closure cost estimate. The feed rates of antimony, barium, lead, mercury, thallium, and silver in all feed streams, including hazardous waste, fuels, and industrial furnace feed stocks shall not exceed the screening limits specified in appendix I of this part. The wording of the certificate of insurance must be identical to the wording specified in §264.
The notice must be sent by certified mail within 90 days after the end of the fiscal year for which the year-end financial data show that the owner or operator no longer meets the requirements. Design and operation of facility. The surety company issuing the bond must, at a minimum, be among those listed as acceptable sureties on Federal bonds in Circular 570 of the U. The step-by-step precompliance implementation procedure is described below. Is line 6 at least 6 times line 3? This is the worst-case stack that will be used for Steps 4 through 9. The default partitioning assumption for materials fired on a bed is that 5 percent of the ash partitions to the combustion gas. Is line 7 at least 6 times line 3? The Regional Administrator will evaluate other qualifications on an individual basis.